Working With Us
- Who We Are
- Our History
- Working With Stress-Con Industries
- Why Stress-Con Industries is Different
- Geography Served
The following is a brief list of recent projects successfully completed by Stress-Con or that are currently in the construction phase.
• St. Clair County Correctional Facility, Port Huron, MI
Approx. $5.7 million precast contract
Precast: Beams, Columns, Architectural Walls w/Brick, Hollow-core Slabs, and Structural Walls
• Ann Street Parking Deck (U-M), Ann Arbor, MI
Approx. $3.7 million precast contract
Precast: Beams, Columns, Double T’s, Architectural Panels w/Sandblast, Shearwalls, Litewalls, Stair/Elevator Walls, and Stair Flights
• Borgess Hospital Parking Deck, Kalamazoo, MI
Approx. $5.8 million precast contract
Precast: Beams, Columns, Double T’s, Architectural Panels w/Brick and Tile, and Stair Flights
• Lenawee Correctional Facility, Adrian, MI
Approx. $4.0 million precast contract
Precast: Beams, Columns, Walls, and Hollow-core Slabs
• Ramp 3 – Rave Theatre Parking Deck, Kalamazoo, MI
Approx. $800,000.00 precast contract
Precast: Architectural Spandrels w/Brick, Stair/Elevator Walls, and Stair Flights
• Costco Warehouse, Wyoming, MI
Approx. $700,000.00 precast contract
Precast: Architectural Load-Bearing Walls w/Sandblast
• Elkhart County Correctional Facility – 2B, Elkhart, IN
Approx. $5.7 million precast contract
Precast: Architectural Walls w/Sandblast-Exposed Red Aggregate-Form Liner, Beams, Columns, and Structural Walls
• Sunny Fresh Foods Addition, Lake Odesaa, MI
Approx. $1.0 million precast contract
Precast: Insulated Load-Bearing Walls, Beams, Columns, and Double T’s
• METC, Caledonia, MI
Precast: Structural Blast Walls-Hardened Structure
• Whitestone Bay Condominiums, Whitney Township, MI
Precast: Complete Precast Superstructure – Walls, Beams, Columns, Double T’s, Stair/Elevator Walls, and Stair Flights
• Average 12 Walgreens’ stores a year
Precast: Insulated Load-Bearing Walls
• Average 70 bridge projects a year
